Home › Services

Fire Strategy Reports for Welsh Projects

Clear, referenced fire safety strategies for new-build and refurbishment schemes, written to satisfy Building Control and coordinated with your design team at RIBA Stage 2 to 4.

Request a Fixed Fee WhatsApp Us

What a fire strategy gives your project

A fire strategy shows how your building design meets Part B of the Building Regulations 2010 as applied in Wales. Done early, it removes surprises at Building Control stage, protects the design from late changes, and gives the client, the architect and the fire and rescue service a single, agreed picture of how the building will work in a fire.

What the report covers

  • Evacuation strategy, including stay put for blocks of flats
  • Means of warning and escape: travel distances, protected lobbies and stairs, single-stair buildings, inner rooms, escape windows
  • Fire detection and alarm to BS 5839-6, and emergency lighting to BS 5266-1
  • Sprinkler provision, including the Welsh requirement for new homes (Regulation 37A) and BS 9251
  • Internal fire spread: linings, fire resistance, compartmentation, fire doors, cavity barriers and timber frame
  • External fire spread: boundary distances, unprotected areas, roof coverings and cladding
  • Fire service access and water supplies: vehicle access, turning facilities, hydrants
  • Smoke control for common stairs and lobbies
  • Management and handover, including the Regulation 38 fire safety information
  • A schedule of open items and design points for the team to resolve

Who we work with

Developers, housebuilders, architects, housing associations, contractors and private clients across Wales. We work from the drawings, so the strategy can be started as soon as the information is available. The report is annotated on your drawings and referenced to the Welsh Approved Document B volumes and the relevant British Standards, so the design team and Building Control can follow every conclusion.

Why instruct us

Your strategy is prepared by a Graduate Member of the Institution of Fire Engineers with Level 5 Diplomas in Fire Engineering Design and Fire Safety Management, and holding professional indemnity insurance. We identify non-compliance early and say plainly what needs to change, rather than burying it in the appendices.

How it works

  • 1. Brief. Send the drawings, the stage of the design and any known constraints.
  • 2. Fixed fee. A written fixed fee and programme, normally within one working day.
  • 3. Report. Draft issued within the agreed number of working days from receipt of the full information.
  • 4. Review. One consolidated round of design team comments is included, then the revised report is issued.

Frequently asked questions

What is a fire safety strategy?

A fire safety strategy is the report that explains how a building design meets the fire safety requirements of the Building Regulations (Part B in Wales). It sets out the means of warning and escape, internal and external fire spread, sprinklers, and fire service access and water supplies, so that the design team, Building Control and the fire and rescue service can all see how the building is intended to work in a fire.

When do I need a fire strategy?

Most new residential blocks, mixed-use schemes and larger refurbishments benefit from one at RIBA Stage 2 or 3, before the design is fixed. Building Control and the fire and rescue service will often ask for one, particularly for flats with a single stair, buildings with unusual layouts, or where the guidance in Approved Document B is not followed in full.

Which guidance do you use in Wales?

The Welsh Government's Approved Document B, Volume 1 for dwellinghouses and Volume 2 for flats and other buildings, together with the relevant British Standards such as BS 9991 (residential), BS 9999 (other buildings), BS 9251 (sprinklers), BS 5839-6 (dwelling alarms) and BR 187 (external fire spread). Wales has its own requirement for sprinklers in new homes under Regulation 37A.

How much does a fire strategy cost?

Fees are fixed and agreed before work starts, based on the size and complexity of the scheme and the information available. Send the drawings and a short brief and you will get a written fixed fee, normally within one working day.

How long does it take?

A typical Stage 3 strategy for a small to medium residential scheme takes around 10 working days from receiving the full set of drawings, the window and door schedule and the construction details. Timescales are confirmed in the quote.

Do you deal with Building Control and the fire service?

The strategy is written for Building Control and fire and rescue service consultation. It sets out every compliance point clearly and flags any design changes the team needs to make early, when they are cheap to do.

Written by BJD Fire Safety. Level 5 Diplomas in Fire Engineering Design and Fire Safety Management; Graduate Member of the Institution of Fire Engineers.

Send us your drawings for a fixed fee

No obligation. Written quote within one working day. Report within 7–10 days of the site visit.

Request a Quote WhatsApp Us
CallWhatsAppGet a Quote